CompanyHarbourline Building Services (Hong Kong) Northgate Energy Services (UK) Mesa Line Energy Services (US) SiteAll Aberdeen Teesside Great Yarmouth TradeAll Offshore electrician Mechanical technician Instrument technician Process operator Pipefitter Rigger Shared view
Your own view, with names. Only people you choose can see it.
Of your 14 process operators, 14 are already 40% or more of the way to Decommissioning Technician.
The steps most of them share: Flushing, cleaning & making safe → L3 Cold cutting & removal → L3 Pre-decommissioning survey → L2 Waste & materials tracking → L2
People in view 98
Skills backed by records, sign-off or tests 77%
AI results waiting for review 67
Skills on their own account only 161 Lifecycle All stages Build Commission Operate Decommission Risk assessment & method statements: 25 of 98 hold it, 0 at Independent or above Permit to work: 76 of 98 hold it, 60 at Independent or above Isolation & lock-off: 63 of 98 hold it, 45 at Independent or above Working at height & rescue: 76 of 98 hold it, 25 at Independent or above Confined space entry: 26 of 98 hold it, 7 at Independent or above Lifting operations: 12 of 98 hold it, 5 at Independent or above First aid & emergency response: 76 of 98 hold it, 51 at Independent or above Inspection & testing: 6 of 98 hold it, 0 at Independent or above LV installation & wiring: 2 of 98 hold it, 0 at Independent or above Building services installations: 0 of 98 hold it, 0 at Independent or above Fault finding: 46 of 98 hold it, 22 at Independent or above Motors & drives: 26 of 98 hold it, 13 at Independent or above HV switching: 24 of 98 hold it, 18 at Independent or above Protection relays: 24 of 98 hold it, 0 at Independent or above Hazardous area (Ex) electrical: 25 of 98 hold it, 20 at Independent or above Loop checking: 16 of 98 hold it, 11 at Independent or above Field instruments & calibration: 21 of 98 hold it, 13 at Independent or above PLC & control systems: 16 of 98 hold it, 0 at Independent or above SCADA & remote monitoring: 0 of 98 hold it, 0 at Independent or above Fire & gas systems: 16 of 98 hold it, 12 at Independent or above Safety instrumented systems: 1 of 98 hold it, 0 at Independent or above Process fluids & pressure systems: 14 of 98 hold it, 8 at Independent or above Plant operations & control room: 20 of 98 hold it, 14 at Independent or above Start-up & shutdown: 14 of 98 hold it, 10 at Independent or above Process safety & integrity: 14 of 98 hold it, 9 at Independent or above Water treatment: 1 of 98 hold it, 0 at Independent or above Mechanical fitting & alignment: 37 of 98 hold it, 29 at Independent or above Bolted joint integrity: 34 of 98 hold it, 24 at Independent or above Small-bore tubing: 17 of 98 hold it, 8 at Independent or above Hydraulics: 22 of 98 hold it, 15 at Independent or above Rotating equipment & gearboxes: 23 of 98 hold it, 17 at Independent or above Condition monitoring & vibration: 4 of 98 hold it, 0 at Independent or above Flushing, cleaning & making safe: 4 of 98 hold it, 0 at Independent or above Pre-decommissioning survey: 14 of 98 hold it, 0 at Independent or above Well plugging & abandonment support: 0 of 98 hold it, 0 at Independent or above Cold cutting & removal: 2 of 98 hold it, 0 at Independent or above Waste & materials tracking: 1 of 98 hold it, 0 at Independent or above Heavy lift & removal planning: 4 of 98 hold it, 0 at Independent or above Steel erection & installation: 22 of 98 hold it, 8 at Independent or above Drawings & specifications: 22 of 98 hold it, 9 at Independent or above Setting out & survey: 4 of 98 hold it, 0 at Independent or above Foundations & civils interface: 1 of 98 hold it, 0 at Independent or above Rigging & slinging: 10 of 98 hold it, 7 at Independent or above QA/QC & handover dossiers: 3 of 98 hold it, 0 at Independent or above Site supervision: 2 of 98 hold it, 0 at Independent or above Substation equipment: 0 of 98 hold it, 0 at Independent or above HV cable jointing & termination: 1 of 98 hold it, 0 at Independent or above Network switching & control: 0 of 98 hold it, 0 at Independent or above Earthing & bonding: 0 of 98 hold it, 0 at Independent or above Grid connection & compliance: 3 of 98 hold it, 0 at Independent or above DC strings & isolation: 0 of 98 hold it, 0 at Independent or above Mounting & module installation: 0 of 98 hold it, 0 at Independent or above Inverters: 0 of 98 hold it, 0 at Independent or above PV commissioning & testing: 0 of 98 hold it, 0 at Independent or above PV maintenance & thermography: 0 of 98 hold it, 0 at Independent or above Battery management systems: 0 of 98 hold it, 0 at Independent or above Battery systems & cell safety: 0 of 98 hold it, 0 at Independent or above Thermal & fire protection: 4 of 98 hold it, 0 at Independent or above Power conversion systems: 2 of 98 hold it, 0 at Independent or above Battery storage commissioning: 0 of 98 hold it, 0 at Independent or above Hydrogen handling & leak detection: 2 of 98 hold it, 0 at Independent or above Electrolyser systems: 0 of 98 hold it, 0 at Independent or above Compression & storage: 3 of 98 hold it, 0 at Independent or above Hydrogen hazardous areas: 4 of 98 hold it, 0 at Independent or above Heat pumps: 0 of 98 hold it, 0 at Independent or above Refrigerant handling: 0 of 98 hold it, 0 at Independent or above Heat networks: 0 of 98 hold it, 0 at Independent or above Heating controls & BMS: 0 of 98 hold it, 0 at Independent or above Bolt torque & tensioning: 4 of 98 hold it, 0 at Independent or above Turbine installation: 9 of 98 hold it, 0 at Independent or above Blade inspection & repair: 2 of 98 hold it, 0 at Independent or above Pitch & yaw systems: 5 of 98 hold it, 0 at Independent or above Converter & turbine electrics: 3 of 98 hold it, 0 at Independent or above Offshore transfer & sea survival: 76 of 98 hold it, 0 at Independent or above Safety & access Electrical Control & instrumentation Process & operations Mechanical Decommissioning Engineering construction Grid & HV Solar Battery storage Hydrogen Heat Wind Solar PV 0 Solar PV Technician: 0 Battery storage 0 Battery Storage Technician: 0 Commissioning 0 Renewables Commissioning Engineer: 0 Wind turbine 8 Wind Turbine Technician: 8 Wind installation 9 Wind Installation Technician: 9 Offshore wind HV 9 Offshore Wind HV Technician: 9 HV jointer 33 HV Cable Jointer: 33 Substation 0 Substation Technician: 0 Controls & SCADA 1 Controls & SCADA Technician: 1 Hydrogen plant 0 Hydrogen Plant Technician: 0 Heat pumps 0 Heat Pump & Heat Network Engineer: 0 EC mechanical 12 Mechanical Technician (Engineering Construction): 12 Lifting supervisor 2 Lifting Supervisor: 2 Decom: process 14 Decommissioning Technician: 14 Decom: removal 0 Decommissioning Removal Technician: 0 Site supervisor 6 Energy Construction Site Supervisor: 6 + − ⊙ ⛶
Drag skills to play with them · Ctrl or ⌘ + scroll to zoom · ⛶ for full screen
Brighter means more people hold it. Colour shows the most common proof: Test Sign-off Records AI check Own account