DOTBLUE
Sample company · invented people

Your workforce on the grid

A sample company with invented people, scored by the same engine as the journeys. Each skill glows by how many people hold it. Each role shows how many are already on their way.

Your own view, with names. Only people you choose can see it.

Of your 14 process operators, 14 are already 40% or more of the way to Decommissioning Technician.

The steps most of them share:
  • Flushing, cleaning & making safe → L3
  • Cold cutting & removal → L3
  • Pre-decommissioning survey → L2
  • Waste & materials tracking → L2
People in view
98
Skills backed by records, sign-off or tests
77%
AI results waiting for review
67
Skills on their own account only
161
Lifecycle
Risk assessment & method statements: 25 of 98 hold it, 0 at Independent or abovePermit to work: 76 of 98 hold it, 60 at Independent or aboveIsolation & lock-off: 63 of 98 hold it, 45 at Independent or aboveWorking at height & rescue: 76 of 98 hold it, 25 at Independent or aboveConfined space entry: 26 of 98 hold it, 7 at Independent or aboveLifting operations: 12 of 98 hold it, 5 at Independent or aboveFirst aid & emergency response: 76 of 98 hold it, 51 at Independent or aboveInspection & testing: 6 of 98 hold it, 0 at Independent or aboveLV installation & wiring: 2 of 98 hold it, 0 at Independent or aboveBuilding services installations: 0 of 98 hold it, 0 at Independent or aboveFault finding: 46 of 98 hold it, 22 at Independent or aboveMotors & drives: 26 of 98 hold it, 13 at Independent or aboveHV switching: 24 of 98 hold it, 18 at Independent or aboveProtection relays: 24 of 98 hold it, 0 at Independent or aboveHazardous area (Ex) electrical: 25 of 98 hold it, 20 at Independent or aboveLoop checking: 16 of 98 hold it, 11 at Independent or aboveField instruments & calibration: 21 of 98 hold it, 13 at Independent or abovePLC & control systems: 16 of 98 hold it, 0 at Independent or aboveSCADA & remote monitoring: 0 of 98 hold it, 0 at Independent or aboveFire & gas systems: 16 of 98 hold it, 12 at Independent or aboveSafety instrumented systems: 1 of 98 hold it, 0 at Independent or aboveProcess fluids & pressure systems: 14 of 98 hold it, 8 at Independent or abovePlant operations & control room: 20 of 98 hold it, 14 at Independent or aboveStart-up & shutdown: 14 of 98 hold it, 10 at Independent or aboveProcess safety & integrity: 14 of 98 hold it, 9 at Independent or aboveWater treatment: 1 of 98 hold it, 0 at Independent or aboveMechanical fitting & alignment: 37 of 98 hold it, 29 at Independent or aboveBolted joint integrity: 34 of 98 hold it, 24 at Independent or aboveSmall-bore tubing: 17 of 98 hold it, 8 at Independent or aboveHydraulics: 22 of 98 hold it, 15 at Independent or aboveRotating equipment & gearboxes: 23 of 98 hold it, 17 at Independent or aboveCondition monitoring & vibration: 4 of 98 hold it, 0 at Independent or aboveFlushing, cleaning & making safe: 4 of 98 hold it, 0 at Independent or abovePre-decommissioning survey: 14 of 98 hold it, 0 at Independent or aboveWell plugging & abandonment support: 0 of 98 hold it, 0 at Independent or aboveCold cutting & removal: 2 of 98 hold it, 0 at Independent or aboveWaste & materials tracking: 1 of 98 hold it, 0 at Independent or aboveHeavy lift & removal planning: 4 of 98 hold it, 0 at Independent or aboveSteel erection & installation: 22 of 98 hold it, 8 at Independent or aboveDrawings & specifications: 22 of 98 hold it, 9 at Independent or aboveSetting out & survey: 4 of 98 hold it, 0 at Independent or aboveFoundations & civils interface: 1 of 98 hold it, 0 at Independent or aboveRigging & slinging: 10 of 98 hold it, 7 at Independent or aboveQA/QC & handover dossiers: 3 of 98 hold it, 0 at Independent or aboveSite supervision: 2 of 98 hold it, 0 at Independent or aboveSubstation equipment: 0 of 98 hold it, 0 at Independent or aboveHV cable jointing & termination: 1 of 98 hold it, 0 at Independent or aboveNetwork switching & control: 0 of 98 hold it, 0 at Independent or aboveEarthing & bonding: 0 of 98 hold it, 0 at Independent or aboveGrid connection & compliance: 3 of 98 hold it, 0 at Independent or aboveDC strings & isolation: 0 of 98 hold it, 0 at Independent or aboveMounting & module installation: 0 of 98 hold it, 0 at Independent or aboveInverters: 0 of 98 hold it, 0 at Independent or abovePV commissioning & testing: 0 of 98 hold it, 0 at Independent or abovePV maintenance & thermography: 0 of 98 hold it, 0 at Independent or aboveBattery management systems: 0 of 98 hold it, 0 at Independent or aboveBattery systems & cell safety: 0 of 98 hold it, 0 at Independent or aboveThermal & fire protection: 4 of 98 hold it, 0 at Independent or abovePower conversion systems: 2 of 98 hold it, 0 at Independent or aboveBattery storage commissioning: 0 of 98 hold it, 0 at Independent or aboveHydrogen handling & leak detection: 2 of 98 hold it, 0 at Independent or aboveElectrolyser systems: 0 of 98 hold it, 0 at Independent or aboveCompression & storage: 3 of 98 hold it, 0 at Independent or aboveHydrogen hazardous areas: 4 of 98 hold it, 0 at Independent or aboveHeat pumps: 0 of 98 hold it, 0 at Independent or aboveRefrigerant handling: 0 of 98 hold it, 0 at Independent or aboveHeat networks: 0 of 98 hold it, 0 at Independent or aboveHeating controls & BMS: 0 of 98 hold it, 0 at Independent or aboveBolt torque & tensioning: 4 of 98 hold it, 0 at Independent or aboveTurbine installation: 9 of 98 hold it, 0 at Independent or aboveBlade inspection & repair: 2 of 98 hold it, 0 at Independent or abovePitch & yaw systems: 5 of 98 hold it, 0 at Independent or aboveConverter & turbine electrics: 3 of 98 hold it, 0 at Independent or aboveOffshore transfer & sea survival: 76 of 98 hold it, 0 at Independent or aboveSafety & accessElectricalControl & instrumentationProcess & operationsMechanicalDecommissioningEngineering constructionGrid & HVSolarBattery storageHydrogenHeatWindSolar PV 0Solar PV Technician: 0Battery storage 0Battery Storage Technician: 0Commissioning 0Renewables Commissioning Engineer: 0Wind turbine 8Wind Turbine Technician: 8Wind installation 9Wind Installation Technician: 9Offshore wind HV 9Offshore Wind HV Technician: 9HV jointer 33HV Cable Jointer: 33Substation 0Substation Technician: 0Controls & SCADA 1Controls & SCADA Technician: 1Hydrogen plant 0Hydrogen Plant Technician: 0Heat pumps 0Heat Pump & Heat Network Engineer: 0EC mechanical 12Mechanical Technician (Engineering Construction): 12Lifting supervisor 2Lifting Supervisor: 2Decom: process 14Decommissioning Technician: 14Decom: removal 0Decommissioning Removal Technician: 0Site supervisor 6Energy Construction Site Supervisor: 6
  • Brighter means more people hold it. Colour shows the most common proof:
  • Test
  • Sign-off
  • Records
  • AI check
  • Own account